IPAC'23 - Particle Accelerator Projects and Upgrades

IPAC’23 / PARTICLE ACCELERATOR PROJECTS AND UPGRADES 15 Project Region EMEA Project Location Germany Project Type New Project Project Description Integrated research facility, based on a 2.5 GeV soft-to-tender X-ray 4th generation storage ring based synchrotron radiation source. Requirements List Available No Approval Date 30/06/2025 Status of Contracting The project is in the pre-application phase. A pre-conceptional design report is written and has been evaluated. We are now entering the conceptional design phase, followed by the technical design phase. Up to now nothing is contracted. Construction scheduled to start 01/01/2029 Estimated Project Cost 976 MEUR Estimated Construction Duration 5.5 years Type of Equipment to be Purchased Civil construction, technical building infrastucture, MBA lattice (mainly PM magnets) based 2.5 GeV low emittance storage ring with full energy injector booster synchrotron and injector linac, in and out of vacuum insertion devices, PM and EM Magnets, including girder structures, etc. Project Leader(s) Andreas Jankowiak / Bernd Rech Affiliation Helmholtz-Zentrum Berlin für Materialien und Energie GmbH e-mail andreas.jankowiak@helmholtz-berlin.de, bernd.rech@helmholtz-berlin.de Contact Person(s) Markus Sauerborn Affiliation Helmholtz-Zentrum Berlin für Materialien und Energie GmbH e-mail markus.sauerborn@helmholtz-berlin.de BESSY III - The Materials Discovery Facility

RkJQdWJsaXNoZXIy MjQ4NzI=