IPAC'23 - Particle Accelerator Projects and Upgrades
IPAC’23 / PARTICLE ACCELERATOR PROJECTS AND UPGRADES 14 Project Region EMEA Project Location Berlin, Germany Project Type Project Update Project Description The project was officialy accomplished with finalizing the building, the warm machine, the infrastructure and is now transferred to a facility in commissioning, which is mainly by stepwise setting up and operate the injector cryo-modules. As this facility will offer not only accelerator physics for ERL studies, it was renamed SEALab (SRF Electron Accelerator Laboratory) to open up for additional applications, like e.g. UED (ultrafast relativistic electron diffration). Still, bERLinPro will be kept as a label for all ERL studies of this machine. Requirements List Available No Approval Date 01/01/2011 Status of Contracting 98% Construction scheduled to start 25/02/2015 Estimated Project Cost 42M EUR Estimated Construction Duration 7 Type of Equipment to be Purchased SRF cavities, cryostats, solid-state amplifiers, klystrons (CW, 1.3 GHz), beamline vacuum, magnets, beam diagnostics, LLRF equipment, cooling water equipment, beam dump, local cleanrooms, power supplies Project Leader(s) Axel Neumann, Thorsten Kamps (deputy) (since April 2021) Affiliation Helmholtz-Zentrum Berlin e-mail Axel.Neumann@helmholtz-berlin.de Contact Person(s) Axel Neumann Affiliation Helmholtz-Zentrum Berlin e-mail Axel.Neumann@helmholtz-berlin.de Berlin Energy Recovery Linac Project
Made with FlippingBook
RkJQdWJsaXNoZXIy MjQ4NzI=